Tuckertown

The Tuckertown development is located in Rowan, Davidson, Stanly, and Montgomery counties, North Carolina on the Yadkin River at river mile 244.3. Completed in 1962, the Tuckertown development was the last of the Project developments to be built. The Tuckertown development consists of a dam, powerhouse, and reservoir. Tuckertown Reservoir has a normal full pool area of 2,560 acres and a drainage area of 4,080 square miles.

Hydrostation Facts

The Tuckertown powerhouse is located immediately downstream of the intake structure between the east non-overflow and middle non-overflow gravity sections of the dam. The powerhouse contains three Kaplan turbine units directly connected to generators. Each unit has a licensed capacity of 12.68 MW for a total licensed capacity of 38.04 MW.

Date Opened: 1962
Surface Area Acreage: 2,560 acres
Generating Capacity: 38.04 megawatts
NC Counties: Rowan, Davidson, Stanly, Montgomery